The Portal is a new £16 million Public Services Hub in Ellesmere Port, delivered by Vinci Construction for Cheshire West Council. The new facility is home to more than 500 council and public sector staff, a Job Centre Plus and a Citizen’s Advice Bureau. The Direct Fix system we specified is a cost-efficient solution for steel frame structures, which generates exceptional insulation and with a silicone render finish provides high levels of fire rating (A2,s1-d0). An ideal solution for this commercial new build. The EWI needed to be line and level with the aluminium cladding, and to achieve this we specified K Systems M and selected 200mm mineral wool insulation boards. For the finish, a silicone render was specified. This durable, low maintenance finish offers an eye catching, clean design, creating a modern and contemporary aesthetic.
An EWI system generating exceptional performance and provides the highest of levels of fire resistance and non-combustibility.
Direct Fix is an external wall insulation system that is suitable for steel framed buildings.
Exicco is an external wall insulation system that is suitable for steel and timber framed buildings.
Manchester, England
Morecambe, England